Schedule a Call Back
Kerala?s Kannur airport gets DGCA clearance
The airport is spread across 2,300 acre and developed at an expense of Rs 22.92 billion. It is expected to serve more than one million passengers per annum (mppa) and is reportedly to increase by five times by 2025.
The airport is equipped with a solar power system and has got an LEED gold rating for energy and environment conservation.
Works on terminal, building, runway and airside facilities are finished. The terminal building includes features such as HHMD (hand-held metal detector), DFMD (door frame metal detector), baggage handling system, inline X-ray machine, check-in counters, passenger boarding bridge, immigration check-points, lifts and escalators. As reported, land acquisition process is under execution for extending the length of the runway to 4,000 m.
Reportedly, a four-storey airport office, an international air cargo complex, a five-storey CISF residential complex, a 23-km-long road along the boundary walls, lighting facilities and landscape beautification is expecting completion within a time frame of one and a half years. According to reports, all the required measures for starting commercial operations at the airport will be completed by the end of this year.
Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Ranchi, Hatia & Tatanagar railway stations to be redeveloped at Rs 11 Bn
The central government has allocated Rs 11.4 billion for the redevelopment of three major railway stations in Jharkhand—Ranchi, Hatia and Tatan...
Efficient Genset
Tata Motors has unveiled a wide range of new-age gensets including CPCB IV+ compliant available from 25kVA to 125kVA power range. These gensets a...
Jewar Airport to Become Asia’s Largest, Operations Begin April 2025
Jewar International Airport is set to become Asia’s largest airport, with commercial operations expected to begin in April 2025, according to C...