Schedule a Call Back
PM Modi lays foundation stones for Thane Metro and mass housing project. Know more about the projects!
The two metro corridors include the Thane-Bhiwandi-Kalyan stretch of 24.9 km and is expected to be built at an estimated cost of Rs 84.16 billion, and the Dahisar-Mira-Bhayander line, which will run 10.3 km long, is expected to be built at an estimated cost of Rs 66.07 billion. The construction will reportedly begin in March 2019.
The Thane-Bhiwandi-Kalyan stretch will reportedly have 17 stations and will carry 2.29 lakh commuters daily, while the elevated Dahisar-Mira-Bhayander metro corridor will comprise of eight stations and will be integrated with the Dahisar-Andheri corridor.
The housing scheme will reportedly comprise of 90,000 units under the Pradhan Mantri Awas Yojana, of which 53,000 units will reportedly be built for Economically Weaker Sections (EWS) and 37,000 for Lower Income Groups (LIG). The project is expected to be built in the Taloja node, around railway stations like Juinagar, Sanpada, Kharkopar and Bamandongri, and some bus terminals. The mass housing project is expected to be completed in three phases within three years.
Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us