VOC Port Trust plans third container terminal

According to reports, the VO Chidambaranar (VOC) Port in Thoothukudi plans to construct a third container terminal with the current handling capacity at the two private terminals set to reach its maximum by end of this fiscal. Currently there are two container terminals at VOC Port, PSA SICAL Container Terminal and the Dakshin Bharat Gateway Container Terminal (DBGT). Together, the two terminals are expected to reach a maximum capacity of 1.2 million TEUs by the end of this financial year.

The VOC Port Trust plans to convert berth No. 9 as a container terminal with a handling capacity of 0.6 million TEUs. The tenth birth has also been identified for possible container handling in future with a capacity of 0.88 million TEUs.

Related Stories

TRUMPF Orders Rise 7% as Sales Reach €4.34 Billion

TRUMPF reported preliminary sales of €4.34 billion for fiscal year 2025/26, marginally above €4.33 billion in the previous year. Order intake...

Read More

TrucksUp Celebrates Truck Drivers’ Role in India’s Growth

TrucksUp has celebrated July 19 as TrucksUp Drivers’ Day with a special appreciation initiative across its network, recognising the contributio...

Read More

GS Caltex India Refreshes Kixx Brand Identity in India

GS Caltex India has unveiled the refreshed global identity of its flagship lubricant brand, Kixx, in India, marking a new phase in the brand’s ...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back