Brokk relocates Stanhope facility

Brokk, the world?s leading manufacturer of remote-controlled demolition machines, recently opened the doors to their relocated Stanhope, New Jersey, distribution and service facility. The new building is in the same industrial complex as the original location but offers the company 33 per cent more space for increased inventory.

Additionally, the added room allows the Stanhope team to offer Brokk demonstrations onsite.

?As Brokk?s presence in the United States has grown, so has interest in seeing the power and precision of our machines firsthand. It is an exciting position to be in,? said Lars Lindgren, President of Brokk Inc. ?Part of the decision to move our Stanhope facility was the need to increase inventory to better meet our customers? needs, but in addition, it gave us the opportunity to add an onsite demonstration area. The move allows us to better support our customers across the US and Canada and provides a perfect setting to experience the intelligent demolition power Brokk offers.?

The 9,600-sq ft (892-sqm) facility has allowed the Brokk team to increase their inventory by 50 per cent. The facility stocks nearly every Brokk model, including multiple 110, 170 and 200 units. The new Stanhope facility also stocks a range of Brokk attachments, including buckets, crushers, grapples and breakers. The additional space offers the Brokk specialists better manoeuverability for loading and unloading equipment, pre-delivery equipment inspections and maintenance, allowing them to optimise productivity and address customer needs more efficiently.

For contractors on the East Coast, the addition of an onsite demonstration area increases access to a first-hand Brokk experience. Now, visitors can easily see the benefits of remote-controlled demolition in common applications, including concrete crushing, breaking and drilling.

The Stanhope facility currently offers select equipment servicing by appointment. In conjunction with the St. Joseph, Missouri Demonstration and Service Center and Monroe, Washington Headquarters, the new Stanhope facility allows Brokk specialists to apply a more locally focused approach when addressing customer needs ? increasing productivity and shortening lead times.

Related Stories

JCB Hydromax Sets Hydrogen Land Speed Record at 406.320 mph

British engineering major JCB has set a new world land speed record with its hydrogen-powered JCB Hydromax, achieving an average speed of 406.320...

Read More

Schaeffler India Names Amit Bhalerao as Chief Operating Officer

Schaeffler India has appointed Amit Bhalerao as Chief Operating Officer (COO), effective August 10, 2026. He will lead the company's manufacturin...

Read More

BKT to Showcase Advanced Off-Highway Tyres at Bauma ConExpo

Balkrishna Industries Ltd (BKT) will showcase its latest off-highway tyre solutions at Bauma ConExpo India 2026, scheduled from September 15-18 a...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back