Schedule a Call Back
Indore has 29 projects in the DPR stage and 29 in the tendering stage
2019-02-01
Smart infra:
- Under the smart street lighting works (under Phase-II of Indore?s smart city mission), the city will be installing 16,000 energy-efficient LED street lights with smart controls in the pan-city area. Another project includes decorative fa?ade lighting on various heritage monuments and other important squares, junctions and bridges in the ABD and its peripheral area.
- As part of the ABD, the city is planning for underground cabling works with compact type sub-stations for the Bada Ganpati to Krishnapura Chatri (MG Road) and nearby major roads, and the Jincy Bus Depot to Rambagh Bridge (Subhash Marg) and nearby major roads.
- Besides, redevelopment projects are coming up under the ABD component in the areas of Jinsi, Old SP Office and Urdu School, Sanskrit College ? Subhash Marg, Kabutar Khana, MOG-E (Khayali Ram Ved), Deaf and Dumb School Site, Samajwad Nagar, Balda Colony, Malharganj ? Near Police Station and Hospital, CP Shekhar Nagar, MOG Barracks, Kukkut Palan Kendra, Baxi Bag ? Sadar Bazar Road, Near Indore Wire ? VIP Road.
- Another project includes the development of multilevel car parking in different locations in the ABD, such as Primary School no.6 Bakshi Gali, Malharganj (Site 1 and Site 2), Veer Savarkar Market, (142 two-wheelers and 48 four-wheelers), MT cloth market (Site 1), Government School ? Bhoi Mohalla, Imli Bazar, Government Unnat School near Mukheripura Masjid (Site-3), Jawahar Marg ? Rajmohalla (plot 2), Khajrana Ganesh Mandir.
- Also, a flyover will be coming up at Mhow Naka Square, and widening of the existing river bridge (Subhash marg Bridge and Krishnapura bridge) is another project. Other projects include the development of sector parks, improvement in other existing parks and water huts at 100 locations.
Total budgeted amount: The total amount budgeted for Indore Smart City is Rs 26.20 billion, of which, Rs 1.17 billion has been spent so far.
- SERAPHINA D?SOUZA


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Mumbai’s Seaside Promenade Phase 1 Opens on 15 July
Mumbai, 7 July 2025 – The first phase of Mumbai’s long-awaited seaside promenade, part of the Coastal Road project, will open to the public o...
Rs 80 Million Road Inaugurated to Connect 20 Tribal Villages
A newly constructed 8-kilometre road connecting Pudi, Karangi, and Melikanchuru in Pachipenta mandal, Parvathipuram Manyam District, was inaugura...
Tata Steel to Launch Modular Bridges in India with InQuik
Tata Steel has signed a Memorandum of Understanding (MoU) with Australia-based InQuik Group to introduce modular bridge systems in India, aiming ...