Schedule a Call Back
Rs 90k cr Delhi-Mumbai expressway to be ready by 2023
The highway project, which spans across Haryana, Rajasthan, Madhya Pradesh, Gujarat and Maharashtra, will reduce the distance between Delhi and Mumbai by almost 12 hours.
Currently, the expressway has eight lanes, but it has enough space left on both sides to be expanded to 12 lanes. As many as two million trees and shrubs will be planted on the entire stretch, and it will be watered through drip irrigation.
Power supply will be drawn from both state grids and solar energy to light up the entire freeway. A proposition to establish green fuel stations and hydrogen fuel pumps in this project are being considered, whereas the expressway is set to have scores of resorts, food courts, restaurants and fuel stations on 93 locations.
Helipads and comprehensive trauma centres will be built for the victims of accidents. The project came with a mounting challenge of acquiring around 15,000 hectares of land, and almost 90% of that work is already completed.
The entire stretch will have six-foot walls on both sides to prevent animals and pedestrians from entering the highway.
This will be the first expressway in Asia to have animal overpasses where it runs through wildlife sanctuaries. This is also India's first eight-lane tunnel in Mukundra sanctuary to minimise the impact of traffic zipping past at speeds up to 120 kmph.
Even the adjoining concern, such as compensating farmers, was resolved conveniently through the digital medium. The expressway is slated to save in excess of 320 million litres of fuel yearly.
The National Highways Authority of India (NHAI) is billing it as a "green highway", and it will bring in school children for a plantation drive along the stretch. A proposal to prioritise green fuel stations, including hydrogen fuel pumps, is under discussion.
Also read: Sohna-Jaipur section of Delhi-Mumbai expway to be completed by 2021
Also read: Delhi-Mumbai expressway SPV gets AAA rating

Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Aimtron revenue nearly doubles in FY26
Aimtron Electronics reported strong FY26 results, with consolidated revenue from operations rising 89.2 per cent year-on-year to Rs 3,012 million...
PM inaugurates Rs 40 Billion projects in Sikkim
Narendra Modi inaugurated and laid foundation stones for development projects worth Rs 40 billion in Sikkim during the state’s 50th year of sta...
Adani commits $100 billion for AI infrastructure in India
Adani Group has committed $100 billion to develop a large-scale AI infrastructure platform in India, focusing on integrated energy, digital netwo...
