Afcons Infrastructure wraps up reach-2 of Kanpur Metro

Afcons Infrastructure Limited has completed the construction of 2,000 segments of Kanpur Metro's 7.144 km reach-2.

The Nagpur Metro Phase-1 Orange line project of 38.215 km, with seven elevated stations and a double-decker viaduct of 4.375 km, include a four-level structure at Gaddigodam square.

The company has already completed trial assembly and load testing for its open Web Girder bridge. It secured a contract of Rs 773 crore in 2017 for constructing reach-2 within 2.3 years.

The construction of the double-decker viaduct remains at the Orange line reach-2 of the Gaddigodam Railway Crossing and on Aqua Line reach-4's 1.6 km Vaishno-Devi Prajapati Nagar section, where another double-decker viaduct is being constructed.

Image Source

Related Stories

Ramky Infra Wins Rs 14.01 Billion Dighi Port Project

Ramky Infrastructure has secured an EPC contract worth Rs 14.01 billion from Maharashtra Industrial Township Limited (MITL) for infrastructure de...

Read More

Blum Launches CLIP top BLUMOTION 105° Hinge in India

Blum has introduced the CLIP top BLUMOTION 105° hinge in the Indian market, offering a universal solution designed to improve durability, function...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back