FAC to take call on Arunachal Pradesh’s Etalin Hydroelectric Project

The Union Environment Ministry’s Forest Advisory Committee (FAC) held a meeting recently to consider a proposal for diversion of 1,165.66 hectares of forest land in Arunachal Pradesh’s Dibang Valley for the construction of the 3097-MW Etalin Hydroelectric Project.

The Etalin Hydro Electric Power Company is a joint venture of Hydro Power Development Corporation of Arunachal Pradesh and Jindal Power (JPL) and the project was to be developed the cost of about ₹25,296.95 crore.

The project will involve felling of over 2.8 lakh trees in dense subtropical, evergreen, broad-leaved forest and subtropical rain forest according to a factsheet submitted to the FAC on April 21, 2020.

The FAC has heard the proposal four times so far — on January 28, 2015, February 28, 2017, October 17, 2019 and April 23, 2020. Following widespread criticism by scientists and environmentalists, the committee had deferred its decision on the project, but heard the proposal again recently.

As per reports, scientists from 16 research institutes wrote to the FAC stating that a fresh assessment of the region’s biodiversity must be conducted before the project is given approval.


Related Stories

Flipkart Expands Supply Chain by Rs 12 Billion for Festive Rush

Bengaluru, Karnataka: Flipkart, India’s leading e-commerce platform, has announced a significant Rs 12 billion expansion of its nationwide supp...

Read More

Knauf India Launches Eco-Friendly Gypsum Flooring Range

Knauf India, the global leader in drywall and ceiling solutions, has introduced its latest innovation—GIFAfloor, a modern, high-performance rai...

Read More

Mining Sector Can Gain 15 per cent Efficiency Via Digitalisation

India’s mining and metals sector could boost efficiency by 10 to 15 per cent through digitalisation and automation—achieving gains comparable...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back