Assam govt sets target to produce 3000 MW–4000 MW of solar energy

Assam Chief Minister Himanta Biswa Sarma told the media that the Assam government has set a target to produce 3000 MW–4000 MW of solar energy in the state.

The government has set a target to produce 3000 MW–4000 MW of solar power in the state. One solar power project will be commissioned at Bilasipara soon, Himanta Biswa Sarma said.

The Assam Chief Minister emphasised that there were narrow possibilities for hydroelectric power projects in Karbi Anglong and also mentioned uneven water presence in the area as the key reason behind the move.

The government has to get a solar power project in Dima Hasao and Karbi Anglong districts. The government is not an adherent to accomplishing hydropower projects here. There is no regular discharge of water here that’s why the Longnit project did not flourish, he said.

The Assam government has planned to do solar power projects in both hilly districts, Karbi Anglong and Dima Hasao, Sarma said.

Earlier on May 31, the Assam Chief Minister inaugurated the 70 MW Amguri Solar Park in a bid to augment the power sector of Assam with a focus on renewable energy.

Image Source

Also read: Assam witnesses 25 MW solar project to power APDCL grid

Related Stories

Bids Invited for 120 km Narmada River Cruise in Madhya Pradesh

The Madhya Pradesh Tourism Department has invited bids for operating a 120 km cruise expedition along the Narmada River, connecting Ekatma Dham (...

Read More

REC to Fund Health Equipment in Raipur, Chhattisgarh

REC Limited, a Maharatna CPSE under the Ministry of Power and a leading NBFC, has signed a Memorandum of Agreement (MoA) with the District Health...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back