Assam govt sets target to produce 3000 MW–4000 MW of solar energy

Assam Chief Minister Himanta Biswa Sarma told the media that the Assam government has set a target to produce 3000 MW–4000 MW of solar energy in the state.

The government has set a target to produce 3000 MW–4000 MW of solar power in the state. One solar power project will be commissioned at Bilasipara soon, Himanta Biswa Sarma said.

The Assam Chief Minister emphasised that there were narrow possibilities for hydroelectric power projects in Karbi Anglong and also mentioned uneven water presence in the area as the key reason behind the move.

The government has to get a solar power project in Dima Hasao and Karbi Anglong districts. The government is not an adherent to accomplishing hydropower projects here. There is no regular discharge of water here that’s why the Longnit project did not flourish, he said.

The Assam government has planned to do solar power projects in both hilly districts, Karbi Anglong and Dima Hasao, Sarma said.

Earlier on May 31, the Assam Chief Minister inaugurated the 70 MW Amguri Solar Park in a bid to augment the power sector of Assam with a focus on renewable energy.

Image Source

Also read: Assam witnesses 25 MW solar project to power APDCL grid

Related Stories

Fischer UltiMate™ Series Adds USB-C with Ratchet Locking System

Fischer Connectors, the global leader in high-performance connectivity solutions, has brought its world-renowned Swiss engineering expertise to t...

Read More

Tembo Global bags DI pipe orders worth Rs 51.82 crore

Tembo Global Industries has secured two major domestic orders totalling Rs 51.82 crore for the supply of ductile iron (DI) pipes, reinforcing its...

Read More

IDS brings Spain’s Brétema lighting collection to India

IDS by Innovative Design Group has launched the Brétema collection by Spanish brand a·emotional light in India. The handcrafted lighting range,...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back