Schedule a Call Back
SAIL-Bhilai Steel supply boosts high-speed rail project
The 508 km project, which is expected to be finished in October 2028, would connect Mumbai and Ahmedabad with a high-speed rail track where trains will run at a speed of 320 km/h.
The rail network will pass through Mumbai, Thane, and Palghar in Maharashtra; and Valsad, Navsari, Surat, Bharuch, Vadodara, Anand, Kheda, and Ahmedabad in Gujarat. The project is being carried out by the National High Speed Rail Corporation.
Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Bids Invited for 120 km Narmada River Cruise in Madhya Pradesh
The Madhya Pradesh Tourism Department has invited bids for operating a 120 km cruise expedition along the Narmada River, connecting Ekatma Dham (...
REC to Fund Health Equipment in Raipur, Chhattisgarh
REC Limited, a Maharatna CPSE under the Ministry of Power and a leading NBFC, has signed a Memorandum of Agreement (MoA) with the District Health...