Schedule a Call Back
Dilip Buildcon backed as L-1 bidder for Rs 1400-cr project

The project entails the engineering, procurement, construction, testing, commissioning, trial run, and operation and maintenance of various Gandhisagar-2 multi-village schemes, districts Mandsaur and Neemuch components in a single package on a “turn-key” job basis, as well as the trial run and operation and maintenance of the entire Madhya Pradesh water supply scheme for ten years. The project is expected to be completed in 24 months, with a 15-year operational duration after commercial operations begin.
Furthermore, the National Highway Authority of India (NHAI) awarded a project worth Rs 1,060 crore to Bangarupalem Gudipala Highways, a fully owned subsidiary of Dilip Buildcon, for the construction of a four-lane Bengaluru-Chennai expressway in Andhra Pradesh on a hybrid-annuity mode (Phase III Package III) with a 24-month completion deadline.
With the project declaration, the share price of the company rose by 2.92% though the company reported a 15% decline in sales in quarter 4 of FY22.
Also Read:
Telangana allots Rs 1200 cr for ORR phase-II drinking water plan
J&K administration to upgrade drinking water infra in Anantnag


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Mussoorie Sky Car to Launch India’s Longest Passenger Ropeway
A new chapter in sustainable mountain tourism and urban mobility is about to unfold as Mussoorie Sky Car gears up to launch the highly anticipated ...
Hikvision Earns Two International Cybersecurity Certifications
Hikvision has achieved two prestigious international certifications: ETSI EN 303 645 and EN 18031. The certifications were awarded by Bureau Veri...
IWAI Partners with Rhenus to Scale Up Cargo on Waterways
The Inland Waterways Authority of India (IWAI) has signed a Memorandum of Understanding (MoU) with Rhenus Logistics India Private Limited to expa...