Schedule a Call Back
Mitsubishi to supply simulators for bullet train project
The letter of acceptance for the design, manufacture, supply, and commissioning of the simulators was issued to Mitsubishi by NHSRCL on July 14. As per the terms of the contract, Mitsubishi is required to deliver the simulators within 28 months from the commencement of the deal.
NHSRCL will be installing two types of simulators at the High Speed Rail (HSR) Training Institute of MAHSR in Gujarat’s Vadodara. The first type will comprise a single train set simulator for the training of the crew, while the second will consist of ten trainees and one instructor console.
“Moreover, their acquisition will make it possible for us to conduct training for a single driver, single conductor, and collective training of drivers, conductors, and despatchers together,” she added.
A sample track has already been laid at the Vadodara institute for the purpose.
Also read:
L&T receives a contract to build a bullet train
Gujarat: 100% civil & track contracts work placed for MAHSR
Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Bids Invited for 120 km Narmada River Cruise in Madhya Pradesh
The Madhya Pradesh Tourism Department has invited bids for operating a 120 km cruise expedition along the Narmada River, connecting Ekatma Dham (...
REC to Fund Health Equipment in Raipur, Chhattisgarh
REC Limited, a Maharatna CPSE under the Ministry of Power and a leading NBFC, has signed a Memorandum of Agreement (MoA) with the District Health...