Schedule a Call Back
Reconstruction of 145-year-old Bailey bridge begins

This is a huge relief because traffic on the Bhopal-Nagpur Highway's NH-69 is still a huge problem. The administration had been attempting to control traffic through a temporary bridge since April, but the backwater from the Tawa Dam and the flooding from the Sukhtawa river were causing ongoing disruptions. Therefore, the administration chose to rebuild the Bailey Bridge with help from the Army.
The same method used to construct bridges in steep places is being employed by the Army. The Army applied a similar strategy along the Indo-China border.
Also read:
NHAI to build underpasses, flyover at Cheranalloor
Construction of 170-km Pune Ring Road to begin post monsoon


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Mumbai’s Seaside Promenade Phase 1 Opens on 15 July
Mumbai, 7 July 2025 – The first phase of Mumbai’s long-awaited seaside promenade, part of the Coastal Road project, will open to the public o...
Adani Ports Builds World’s First Steel Slag Road at Private Port in Hazira
Adani Ports and Special Economic Zone (APSEZ) has inaugurated what is reported to be the world’s first steel slag road within a private port, m...
Tata Steel to Launch Modular Bridges in India with InQuik
Tata Steel has signed a Memorandum of Understanding (MoU) with Australia-based InQuik Group to introduce modular bridge systems in India, aiming ...