Centre issues tender for setting up 2,000-MWh of grid-scale BESS

Union Power Minister, RK Singh said that India will come out with a tender for setting up 2,000 megawatt hour (MWh) of grid-scale battery energy storage system (BESS). This will aid in better grid management while accommodating renewable energy (RE) sources.

Speaking at the first EU-India Green Hydrogen Forum, Singh, who also holds the charge for New & Renewable Energy Ministry, said, “I am adding storage. We came out with a bid for 1,000 MWh. We will come with another bid for 2,000 MWh storage. The quantity of storage which we will be adding, nobody else will be adding because I want RTC green energy. I am serious about energy transition.”

Gird-scale BESS allows power utilities to store energy and deploy it later depending on demand, variability, etc. It becomes crucial for India as the country will need to accommodate 500 GW of non-fossil fuel power requiring grid operators to handle intermittency as well as supply round-the-clock (RTC) power through RE sources.

There are various battery chemistries available or under testing including lithium-ion, lead-acid, redox flow, and molten salt (including sodium-based).

Also read:
SECI floats tender for Standalone Battery Energy Storage System


Related Stories

myHQ Report: Flexible Workspaces Dominate Demand

myHQ reports that 73 per cent of office space searches in India now favour flexible workspaces, with traditional leasing accounting for less than...

Read More

BITS Pilani Opens Smart Manufacturing Centre

BITS Pilani, through its Work Integrated Learning Programmes, inaugurated its Smart Manufacturing Competency Centre in Bengaluru, the second in a...

Read More

TK Elevator Begins India Factory Expansion Project

TK Elevator has commenced expansion of its manufacturing facility in India, marking a step towards strengthening local production and logistics c...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back