Schedule a Call Back
Tata Power arm to set up solar project for Viraj Profile

The plant is expected to generate about 200 MUs of energy and offset approximately 170.43 million Kg of CO2 annually. With the commissioning of this plant, Viraj Profile's dependability on non-renewable power resources will be reduced by approximately 50%.
The project is expected to be commissioned by July 2023, TPREL said without sharing any financial details of the project. According to industry estimates, to set up every 1 MW of solar capacity, an investment of over Rs 4.5 crore is required.
Also read:
Tata Power joins Viraj Profile for captive solar plant


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Mumbai’s Seaside Promenade Phase 1 Opens on 15 July
Mumbai, 7 July 2025 – The first phase of Mumbai’s long-awaited seaside promenade, part of the Coastal Road project, will open to the public o...
Rs 80 Million Road Inaugurated to Connect 20 Tribal Villages
A newly constructed 8-kilometre road connecting Pudi, Karangi, and Melikanchuru in Pachipenta mandal, Parvathipuram Manyam District, was inaugura...
Tata Steel to Launch Modular Bridges in India with InQuik
Tata Steel has signed a Memorandum of Understanding (MoU) with Australia-based InQuik Group to introduce modular bridge systems in India, aiming ...