Assam’s Palashbari-Chandubi highway close to completion

The first construction project under the Assam Mala scheme, the Palashbari-Chandubi two-lane highway, will be completed within a week, according to Kartik Biswas, the executive engineer of South Kamrup Territorial Road Division. “The construction will be completed six months ahead of the stipulated time,” he said.

The highway will connect South Kamrup to the Assam-Meghalaya border in West Guwahati. It will cut the travel time from Mirza to Chandubi (32 km) from one and a half hours to 40 minutes. The new highway has been built alongside the river Brahmaputra and stretches from Palashbari to Chandubi.

The two-lane highway passes by Mirza, Barihat, Loharghat, Borduar and Muduki. It was planned to be 26 km long, but after protests against two-laning the highway on this particular stretch, Assam Chief Minister of Assam Himanta Biswa Sarma called off the construction of a 6-km stretch which has the Borduar Reserve Forest to its north and Mayang Hill Reserve Forest to its south.

The protests had erupted back in August after around 2,000 trees which are 100-150 years old were earmarked to be felled for the purpose. The highway has now been expanded to a two-lane only until Muduki. The 6-km stretch beyond Muduki has been kept single-lane and construction has been halted.

However, even while constructing the existing stretch, thousands of century-old high value trees were felled. Many high-value trees have been planted again by the officials and villagers, even if their survival rates are fairly low.

See also:
Steel Slag Roads: Techno-economic and environmental benefits
Ministry starts mandatory training course on highway DPRs


Related Stories

Fischer UltiMate™ Series Adds USB-C with Ratchet Locking System

Fischer Connectors, the global leader in high-performance connectivity solutions, has brought its world-renowned Swiss engineering expertise to t...

Read More

Tembo Global bags DI pipe orders worth Rs 51.82 crore

Tembo Global Industries has secured two major domestic orders totalling Rs 51.82 crore for the supply of ductile iron (DI) pipes, reinforcing its...

Read More

IDS brings Spain’s Brétema lighting collection to India

IDS by Innovative Design Group has launched the Brétema collection by Spanish brand a·emotional light in India. The handcrafted lighting range,...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back