Schedule a Call Back
Consultant for Hooghly River tunnel project in Kolkata Port gets hired

If the proposed tunnel is built, it will be the second of its sort in the nation, following the tunnel built by the East West Metro Railway.
The proposed tunnel will allow the cargo-laden trucks of the port to leave the Khidirpur dock area quickly and without obstruction, as well as relieve traffic on the city's highways.
The study, which could require an investment of Rs 20 billion, is anticipated in 7-8 months.
Also read:
Adani Ports bags Rs 250-bn greenfield project in Bengal
Sonowal launches multiple projects for development of Bogibeel


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Covestro Develops Fire-Safe Foam for EV Battery Safety
Covestro has introduced Baysafe® BEF, a new flame-retardant polyurethane foam designed to enhance battery safety in EVs and energy storage syste...
Western Railway Mumbai Logs Rs 1 Billion in Digital Payments
In a significant boost to the Digital India initiative, the Mumbai Division of Western Railway has recorded over Rs 1 billion in digital payments...
Himadri PAT Rises 48% in Q1 Amid Global Battery Push
Himadri Speciality Chemical Ltd reported its highest-ever quarterly EBITDA of Rs 234 crore and PAT of Rs 183 crore for Q1 FY26, with profitabilit...