Schedule a Call Back
Cable-stayed bridge in Mumbai's western suburbs for connectivity

The primary goal of this project is to increase road connectivity between the western suburbs' Versova, Malad, and Marve neighbourhoods, which are now separated by mangroves, mudflats, and streams. This bridge will cut the travel time between Versova and Madh island in half. At the moment, travelling along SV Road and Link Road takes at least an hour. Travel time may exceed two hours at rush hour.
The bridge will allow for continuous transportation 365 days a year. Because ferry services are frequently unavailable during the monsoon, travellers must travel through Malad by bus, cab, or local train, which significantly lengthens their route.
The bridge would also help to boost the economy of the Madh and Marve areas, which are primarily occupied by fishermen who travel by boat to the fish markets in the Andheri and Dadar districts. This bridge will increase connectivity by expanding their travel alternatives.


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Mumbai’s Seaside Promenade Phase 1 Opens on 15 July
Mumbai, 7 July 2025 – The first phase of Mumbai’s long-awaited seaside promenade, part of the Coastal Road project, will open to the public o...
Rs 80 Million Road Inaugurated to Connect 20 Tribal Villages
A newly constructed 8-kilometre road connecting Pudi, Karangi, and Melikanchuru in Pachipenta mandal, Parvathipuram Manyam District, was inaugura...
Tata Steel to Launch Modular Bridges in India with InQuik
Tata Steel has signed a Memorandum of Understanding (MoU) with Australia-based InQuik Group to introduce modular bridge systems in India, aiming ...