Schedule a Call Back
CIL ties up with three PSUs over surface gasification projects

Syngas is synthesis gas, a mixture of carbon monoxide, carbon dioxide, and hydrogen. The projects would reduce forex outgo and create around 23,000 jobs, the coal ministry said. This gasification of 100 mt coal will happen in three phases.
In the first phase from 2020-2024, 4 mt will be gasified with an investment of Rs 20,000 crore. In the second phase from 2020-2026, six mt involving an investment of Rs 30,000 crore and 90 mt in the third phase from 2022-2030 at an investment of Rs 3.6 lakh crore.


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Mumbai’s Seaside Promenade Phase 1 Opens on 15 July
Mumbai, 7 July 2025 – The first phase of Mumbai’s long-awaited seaside promenade, part of the Coastal Road project, will open to the public o...
Rs 80 Million Road Inaugurated to Connect 20 Tribal Villages
A newly constructed 8-kilometre road connecting Pudi, Karangi, and Melikanchuru in Pachipenta mandal, Parvathipuram Manyam District, was inaugura...
Tata Steel to Launch Modular Bridges in India with InQuik
Tata Steel has signed a Memorandum of Understanding (MoU) with Australia-based InQuik Group to introduce modular bridge systems in India, aiming ...