Schedule a Call Back
Key Hyderabad road to get a makeover for Formula E race

Within a month, the existing road around Hussainsagar Lake will be refurbished by black-topping between NTR Marg and the lake. Following this, various tests for road safety will be carried out to make the track suitable for the adventurous racing event. The Formula E track is about 2.80 km long with 17 turns, and the HMDA officials are making special arrangements for the spectators to witness the event.
“Black-topping will be done on the existing road up to the lake and dividers will be created for people to walk along the lake shore,” a HMDA official said. The race circuit begins opposite the NTR Garden, travels through NTR Marg and Prasad I-Max Road, and then loops back to where it began. The track's width ranges from nine to 11 metres. At the I-Max turning point, there will be a pit stop for vehicle arrangements. The track development work is now underway and should be finished by mid-November, the official said.
See also:
Samruddhi Mahamarg's longest tunnel in Maharashtra is nearing completion
Pune authorities ordered to repair 400 km of poor roads


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Mumbai’s Seaside Promenade Phase 1 Opens on 15 July
Mumbai, 7 July 2025 – The first phase of Mumbai’s long-awaited seaside promenade, part of the Coastal Road project, will open to the public o...
Adani Ports Builds World’s First Steel Slag Road at Private Port in Hazira
Adani Ports and Special Economic Zone (APSEZ) has inaugurated what is reported to be the world’s first steel slag road within a private port, m...
Tata Steel to Launch Modular Bridges in India with InQuik
Tata Steel has signed a Memorandum of Understanding (MoU) with Australia-based InQuik Group to introduce modular bridge systems in India, aiming ...