Schedule a Call Back
Four bidders submit bids for Chennai Metro’s line-4 PSD contract

The contract is for design, manufacture, supply, installation, testing and commissioning of platform screen doors for CMRL Phase II Corridor 4.
On this route of Chennai Metro’s Phase 2, full-height platform screen doors will be installed at ten underground stations’ twenty platforms, while half-height PSDs will be put at eighteen elevated stations’ thirty-six platforms.
Chennai Metro Rail (CMRL) floated bids for this contract, which was financed by the AIIB and ADB in May 2022 and had a deadline of 2245 (6.15 years) with an undetermined estimate.
All four bids have been sent for technical bid evaluation, which could take a few months to complete. The financial bids of the technically qualified bidders will be opened after that to reveal who are the lowest bidder and most likely supplier.


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Mumbai’s Seaside Promenade Phase 1 Opens on 15 July
Mumbai, 7 July 2025 – The first phase of Mumbai’s long-awaited seaside promenade, part of the Coastal Road project, will open to the public o...
Adani Ports Builds World’s First Steel Slag Road at Private Port in Hazira
Adani Ports and Special Economic Zone (APSEZ) has inaugurated what is reported to be the world’s first steel slag road within a private port, m...
Tata Steel to Launch Modular Bridges in India with InQuik
Tata Steel has signed a Memorandum of Understanding (MoU) with Australia-based InQuik Group to introduce modular bridge systems in India, aiming ...