Illegal mining in Dadam; NGT slaps fine of Rs 660 mn

The Principal Bench of National Green Tribunal (NGT) has maintained that the project proponents (PP) of the Dadam mines in Tosham, district Bhiwani would have to pay the fine amounting to approximately Rs 660 million for various violations that have been upheld by the NGT.

The current PP Goverdhan Mines and Minerals, as well as his predecessor M/s Sunder Marketing Associates, have both been held accountable for violating required norms while performing mining operations at the Dadam mining site.

10 per cent of the total penalties of Rs 660 million will have to be placed in the Pollution Control Board and will be used to compensate for environmental harm.

Also Read
Cidco invites bids for rooftop solar systems in Navi Mumbai
Dharavi revamp: pact inked for 47.5 acres of railway land

Related Stories

Mumbai’s Seaside Promenade Phase 1 Opens on 15 July

Mumbai, 7 July 2025 – The first phase of Mumbai’s long-awaited seaside promenade, part of the Coastal Road project, will open to the public o...

Read More

Adani Ports Builds World’s First Steel Slag Road at Private Port in Hazira

Adani Ports and Special Economic Zone (APSEZ) has inaugurated what is reported to be the world’s first steel slag road within a private port, m...

Read More

Tata Steel to Launch Modular Bridges in India with InQuik

Tata Steel has signed a Memorandum of Understanding (MoU) with Australia-based InQuik Group to introduce modular bridge systems in India, aiming ...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back