Schedule a Call Back
NF Railway track, bridge renewal drive picks up speed

A sleeper renewal of 12.81 tonne kilometre (TKM) has been done during September, making cumulative progress of 61.01 TKM during the last six months. Turnout renewals of 18.5 equivalent sets have been done last month, making cumulative progress of 83 sets during the current fiscal till September. Sixteen bridges have been rehabilitated during September, making cumulative progress of 96 bridges during the period.
Besides,1546.24 km of tracks has been tested by Ultra Sonic Flaw Detection (USFD) machines during September, making cumulative progress of 10529.18 km during the period.
"The basic objective behind this rapid progress in track renewal activities is to further gear up the safety in train operations," the NFR press release said.
See also:
Railways to rent out decommissioned coaches to running restaurants
Four-decade-old Railways unit specialising in procurement to close


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Mumbai’s Seaside Promenade Phase 1 Opens on 15 July
Mumbai, 7 July 2025 – The first phase of Mumbai’s long-awaited seaside promenade, part of the Coastal Road project, will open to the public o...
Adani Ports Builds World’s First Steel Slag Road at Private Port in Hazira
Adani Ports and Special Economic Zone (APSEZ) has inaugurated what is reported to be the world’s first steel slag road within a private port, m...
Tata Steel to Launch Modular Bridges in India with InQuik
Tata Steel has signed a Memorandum of Understanding (MoU) with Australia-based InQuik Group to introduce modular bridge systems in India, aiming ...