The role of a project manager in successful execution

The term “Project Management” itself speaks volumes of the humongous attributes that are related with a project. But in a nutshell, let me brief in a micro level. It starts in-fact prior to the actual inception of the project wherein the DPR is made, floated, and finally sanctioned. This is followed by acquiring the required funds through EQUITY, and also through PTA. A basic programme is prepared, and the key dates are assigned for typical works related to the project and a flow chart is prepared based on the various activities (partial and total floats). Finally, various tenders – depending on the kind of work – are called and awarded to the respective contractor(s) for commencement of the works. The workflow parameters are maintained and monitored on our 5D BIM platform, and through SAP, wherein we have the provision of uploading drawings, (1 to 3D), updating and revising the Key Date’s (KD’s) as per the access provided (primavera-4D), and finally asset tagging the product that is made into use for the project. In fact, we have also incorporated the 6D platform as well wherein the O&M has also been digitalised.

Related Stories

Southco Launches N5 Lift-and-Turn Latch

Southco has introduced the N5 Lift-and-Turn Compression Latch, featuring a folding T-handle and integrated sealing performance within a compact h...

Read More

Walplast’s GypEx Range Secures GreenPro Certification

Walplast Products has received GreenPro Ecolabel certification from the CII-Green Products and Services Council for six products under its HomeSu...

Read More

Adani Cement, NAREDCO Form Strategic Alliance

Adani Cement has entered into a strategic partnership with the National Real Estate Development Council (NAREDCO) to support India’s expanding ...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back