Maharashtra set to begin work on Alibaug-Virar corridor

After the commissioning of Phase 1 of the 701-km Mumbai-Nagpur Samruddhi Mahamarg (Nagpur Expressway) on December 11, the Maharashtra government has turned its attention to the long-delayed Alibaug-Virar Multi Modal Corridor.

The implementing authority for the project, the Maharashtra State Road Development Corporation (MSRDC), is in talks with lenders including the Asian Development Bank (ADB). The state Cabinet last month gave approval in principle to seek loans from the Housing and Urban Development Corporation (HUDCO) and other lenders.

The MSRDC hopes to secure funding, issue tenders, give work orders, and begin work on the ground next year.

The Multi Modal Corridor will be a high-speed expressway connecting Alibaug in Raigad district to Virar in Palghar district. The 127-km long road will traverse the three districts of Raigad, Thane and Palghar, which are part of the Mumbai Metropolitan Region.

This greenfield road would augment connectivity to potential growth centres like Virar, Bhiwandi, Kalyan, Dombivali, Panvel, Taloja and Uran. It would also help divert the flow of cargo from the Jawaharlal Nehru Port Trust, which currently gets stuck in the internal roads of Mumbai, Thane and Navi Mumbai. The Multi Modal corridor would also be connected to major national highways.

The corridor was conceptualised a decade ago and approved in 2012, but work never began on the ground. As of now, the project cost is estimated at Rs 555.64 billion (compared to Rs 125.54 billion estimated in 2012).

See also:
Highway construction fails to achieve FY23 target
NHIDCL inks MoU with NIT Manipur for highway tech


Related Stories

Mumbai’s Seaside Promenade Phase 1 Opens on 15 July

Mumbai, 7 July 2025 – The first phase of Mumbai’s long-awaited seaside promenade, part of the Coastal Road project, will open to the public o...

Read More

Rs 80 Million Road Inaugurated to Connect 20 Tribal Villages

A newly constructed 8-kilometre road connecting Pudi, Karangi, and Melikanchuru in Pachipenta mandal, Parvathipuram Manyam District, was inaugura...

Read More

Tata Steel to Launch Modular Bridges in India with InQuik

Tata Steel has signed a Memorandum of Understanding (MoU) with Australia-based InQuik Group to introduce modular bridge systems in India, aiming ...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back