Bengaluru's first double-decker flyover to complete by March 2023

The city's double-decker flyover, which was supposed to open in October 2021 but has been delayed, is now expected to open in March 2023. The 3.3 km flyover on Marenahalli Road between Ragigudda and Central Silk Board will have a lower deck for vehicles and an upper deck for the Namma Metro.

The Bangalore Metro Rail Corporation (BMRCL) is in charge of building the flyover. This will be the first time in the city that a Metro line will run above a flyover. The elevated road will be 8m above the current road level, and the Metro line will be 16m above the surface. Cities like Jaipur, Nagpur, and Mumbai already have similar structures.

Also read:
Underground drainage project in Karnataka's Madikeri at standstill
K'taka Assembly passes BMLTA Bill to unify public transport

Related Stories

Mumbai’s Seaside Promenade Phase 1 Opens on 15 July

Mumbai, 7 July 2025 – The first phase of Mumbai’s long-awaited seaside promenade, part of the Coastal Road project, will open to the public o...

Read More

Rs 80 Million Road Inaugurated to Connect 20 Tribal Villages

A newly constructed 8-kilometre road connecting Pudi, Karangi, and Melikanchuru in Pachipenta mandal, Parvathipuram Manyam District, was inaugura...

Read More

Tata Steel to Launch Modular Bridges in India with InQuik

Tata Steel has signed a Memorandum of Understanding (MoU) with Australia-based InQuik Group to introduce modular bridge systems in India, aiming ...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back