Schedule a Call Back
Railways readies Rs 180,000 million plan for Vande Bharat maintenance
The Indian Railways have devised a plan that amounts to approximately 180,000 million to increase the size of its locomotive maintenance facilities for Vande Bharat trains, with the goal of expanding the use of these semi-high-speed trains to a wider area.
The country's lack of adequate maintenance depots has emerged as a major obstacle to the rollout of these trains in many areas, so the upgrade will allow for faster expansion.The Railway Board claims that there are 58 maintenance coaching depots or locations that have the capacity to accommodate 100 Vande Bharat trains.
Likewise a note from the Research Design and Standards Organisation, a technical adviser for the railway industry, stated, "Necessary maintenance infrastructure must be planned and developed simultaneously to ensure high reliability and availability of train sets.
The railways are pushing for improved stations and upgraded track infrastructure in addition to the approximately 475 Vande Bharat trains that are currently in the pipeline. It is planning to construct 25,000 km of brand-new tracks and significantly upgrade railway stations so that they can serve as commercial hubs in the heart of cities.

Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Adani commissions 1,000 MW HVDC link for Mumbai
Adani Energy Solutions has commissioned a 1,000 MW high-voltage direct current (HVDC) transmission link between Kudus and Aarey, strengthening po...
Dalmia Bharat recognised for CSR excellence
Dalmia Bharat Limited was recently recognised for ‘Significant Achievement’ in the Manufacturing sector under Excellence for Corporate Social...
West Avenue Realty raises Rs 500 million via NCDs
West Avenue Realty has raised Rs 500 million through non-convertible debentures (NCDs) within three years of operations, signalling strong investor...
