Schedule a Call Back
Mumbai Metro: 2A & 7 services to begin from 20 Jan

S V R Srinivas, the metropolitan commissioner, declared: "We have decided to start the commercial run at 4 pm on January 20.
During peak hours, the services will be offered at a frequency of every eight minutes. The time between trains will be reduced to 10 minutes during non-peak times.
The Metro services will initially run with just 22 rakes, even though there are 28 rakes available out of the 44 needed to operate the routes.
Eknath Shinde, the chief minister, said: & We are here to check this metro line, jointly the metro lines 2A (Andheri-west to Dahisar), Metro 7, before of PM Narendra Modi's visit to Mumbai on January 19. (Andheri East to Dahisar). It will greatly relieve traffic and greatly benefit Mumbaikars living in the western suburbs.
Bharat Earth Movers Limited constructed the 2,280 passenger-capable six-car rakes as a part of the Make in India initiative. Srinivas stated, "We will raise the frequency to 4-5 minutes," as new rakes are introduced to the fleet.
From Andheri-west (Line 2A) to Gundavali (Line 7), the first service will depart at 6 in the morning, and the last service will depart at 9.24 in the evening. The first train leaving Gundavali will run at 5.55 in the morning, and the last one will leave at 9.24 in the evening. The trains won't stop in Dahisar along the entire length of Lines 2A and 7.
The journey from Andheri-W to Gundavali via Dahisar would take 75 minutes. But the 18.6 km on Line 2 between Andheri-W and Dahisar and the 16.5 km on Line 7 between Dahisar and Gundavali will only take you 40 and 35 minutes, respectively.
We anticipate that the daily ridership would reach 4-5 lakh, according to Srinivas. Currently, 39,000 people use Phase I of both of these lines (Dahanukarwadi-Dahisar-Aarey), although officials claim the short route does not link to high-density areas of Andheri. The minimum and maximum fares are respectively Rs 10 and Rs 60.


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Rajesh Power Services Bags Rs 9,219 Mn Orders from UGVCL
Rajesh Power Services Limited, a leading EPC contractor in power transmission and distribution, has announced new project wins worth Rs 9,219 mil...
Jindal Stainless to double slag processing with new USD 150 mn wet milling plant
In a major step toward circular manufacturing, Jindal Stainless, India’s largest stainless steel producer, is set to double its slag processing...