Schedule a Call Back
11 km of twin tunnel work put out to tender between Borivali and Thane

The six-lane road project, costing Rs 110 billion, is anticipated to cut the 1.5-hour travel time between Thane and Borivali in half to 15-20 minutes. This year, the construction will probably start before the monsoon.
The twin-tube road tunnel, the approach road, and other civil works between Thane and Borivali were the subject of a tender released by MMRDA. This 11.8 km tunnel route connects Tikujiniwadi in Thane to the Western Express Highway's Borivali end and features a 10.25 km double-lane tunnel, a 1.55 km junction, and two tunnels with three plus three lanes each.
The Thane-Borivali underground road with a tunnel beneath the national park was planned in 2015 by the Maharashtra State Road Development Corporation in consideration of the heavy traffic congestion on Ghodbunder Road in Thane, which causes significant inconvenience to commuters between Borivali and Thane.
Between Tikujiniwadi and Borivali, two underpasses with 3+3 lanes each were planned; construction on the project has already begun. The feasibility study and comprehensive report for the project were authorised, and after making certain revisions, a project proposal was delivered to the forest department.
Also read:
Use of prefab to accelerate road construction
The elevated road between Airoli and Katai Naka is 88% completed


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
NaMo Grand Central Park Wins DNA Paris Design Award 2025
NaMo Grand Central Park, the signature green landmark in the heart of Thane, has been awarded the prestigious DNA Paris Design Award 2025 in the ...
Real Estate Sees Capital Shift as Formalisation Drives Demand
India’s real estate sector is undergoing a structural transformation marked by formalisation, premiumisation, and consolidation—driving a sur...
SYSTRA Opens Hyderabad Office, Hosts Digital Infra Symposium
SYSTRA, a global leader in public transport infrastructure engineering, held its Symposium on Tech-Driven Capital Project Delivery on 31st July a...