Priority corridor of the Bhopal metro on track

In 210 days, the four kilometer-long priority corridor of the Bhopal metro is set to become functional, for this ongoing project the first batch of 18 cm head-hardened rail track for the metro depot arrived on Saturday last week.

In the city, the movement of loaded tracks on heavy vehicles raised a lot of curious eyebrows. The 4-kilometer Bhopal corridor will receive 8,120 MT of track, while the 6.3-kilometer Indore metro, which will be completed in September, will require 8,425 MT.

These rail tracks will initially support approximately 50 coaches and cost INR 1380 million, putting the city metro's priority corridor on the right track. For now,coaches will ply on under construction metro stations and its support system.

By April, the track is expected to be laid. Signaling work is also being worked on simultaneously. According to sources, everything aligns with the project's financial aspect.Following the allocation of INR 7100 million that was made public in the MP budget on March 1.

MPMRCL will apply for the first trench of a loan from the European Investment Bank (EIB). It would help pay for 50 coaches. IIT Mumbai will be in charge of certifying the structural design of the segmental box-girder superstructures in Bhopal and Indore.

Related Stories

Platinum Corp Launches Luxury Suites in Santacruz

Platinum Corp has recently launched Platinum Stellar: Bespoke Presidential Suites, a premium residential project in Santacruz West, Mumbai. The d...

Read More

Noida Airport Fuels NCR Realty Growth

The start of commercial operations at Noida International Airport has recently emerged as a major trigger for real estate growth across Noida, Gr...

Read More

RR Kabel features in Hurun India 500 list

RR Kabel has been featured in the 2025 Burgundy Private Hurun India 500, a list of India’s 500 most valuable companies. The list is compiled by...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back