Indore Metro’s yellow line train maintenance depot being constructed

The viaduct and stations of Yellow Line of Indore Metro are undergoing visible progress in the construction. Another important development is the train maintenance depot between Gandhi Nagar and Super Corridor 6 stations. A contract of Rs 2.47 billion was given to K.S.M. Bashir Mohd. and Sons to build the 26.25- hectare depot in 2022 by the Madhya Pradesh Metro Rail Company Ltd. Under the Phase 1 of Package IN-07 of the Indore Metro, it should be finished in the next three years.

The depot will be utilised to store and maintain Indore Metro’s Alstom train-sets that will operate the Yellow Line. The route will connect Palasia, Railway Station, Rajwara, Airport, and Bhawarsala as it forms a ring around the city of Indore. The Indore and Bhopal Metro has awarded Alstom a contract to provide 156 coaches of rolling stock, with 25 train sets of 3 coaches (a total of 75 coaches) to be given initially. The trains final design has not yet been made public.

Related Stories

Maharashtra Orders City Growth Plans

The Maharashtra Government has directed municipal corporations with populations above 10 lakh to prepare Economic Master Plans aimed at boosting to...

Read More

Cabinet Clears Rs 248.15 Billion Rail Expansion

The Cabinet Committee on Economic Affairs has approved two major railway multitracking projects worth Rs 248.15 billion across Uttar Pradesh and ...

Read More

Tara Park Final Phase Offers Flexible Abu Dhabi Homeownership

"Modon has launched the final phase of Tara Park in a prime central Abu Dhabi location, close to the main bridges connecting to Reem Island. The ...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back