Indore Metro’s yellow line train maintenance depot being constructed

The viaduct and stations of Yellow Line of Indore Metro are undergoing visible progress in the construction. Another important development is the train maintenance depot between Gandhi Nagar and Super Corridor 6 stations. A contract of Rs 2.47 billion was given to K.S.M. Bashir Mohd. and Sons to build the 26.25- hectare depot in 2022 by the Madhya Pradesh Metro Rail Company Ltd. Under the Phase 1 of Package IN-07 of the Indore Metro, it should be finished in the next three years.

The depot will be utilised to store and maintain Indore Metro’s Alstom train-sets that will operate the Yellow Line. The route will connect Palasia, Railway Station, Rajwara, Airport, and Bhawarsala as it forms a ring around the city of Indore. The Indore and Bhopal Metro has awarded Alstom a contract to provide 156 coaches of rolling stock, with 25 train sets of 3 coaches (a total of 75 coaches) to be given initially. The trains final design has not yet been made public.

Related Stories

Platinum Corp Launches Luxury Suites in Santacruz

Platinum Corp has recently launched Platinum Stellar: Bespoke Presidential Suites, a premium residential project in Santacruz West, Mumbai. The d...

Read More

Noida Airport Fuels NCR Realty Growth

The start of commercial operations at Noida International Airport has recently emerged as a major trigger for real estate growth across Noida, Gr...

Read More

RR Kabel features in Hurun India 500 list

RR Kabel has been featured in the 2025 Burgundy Private Hurun India 500, a list of India’s 500 most valuable companies. The list is compiled by...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back