Schedule a Call Back
Indore Metro’s yellow line train maintenance depot being constructed
2023-03-09
The viaduct and stations of Yellow Line of Indore Metro are undergoing visible
progress in the construction. Another important development is the train
maintenance depot between Gandhi Nagar and Super Corridor 6 stations. A contract
of Rs 2.47 billion was given to K.S.M. Bashir Mohd. and Sons to build the 26.25-
hectare depot in 2022 by the Madhya Pradesh Metro Rail Company Ltd. Under the
Phase 1 of Package IN-07 of the Indore Metro, it should be finished in the next three
years.The depot will be utilised to store and maintain Indore Metro’s Alstom train-sets that will operate the Yellow Line. The route will connect Palasia, Railway Station, Rajwara, Airport, and Bhawarsala as it forms a ring around the city of Indore. The Indore and Bhopal Metro has awarded Alstom a contract to provide 156 coaches of rolling stock, with 25 train sets of 3 coaches (a total of 75 coaches) to be given initially. The trains final design has not yet been made public.

Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Amit Shah to Address KRIBHCO National Cooperative Meet in Haryana
Amit Shah, Union Minister of Home Affairs and Cooperation, will address a National Cooperative Conference organised by Krishak Bharati Cooperativ...
