Schedule a Call Back
Sikkim to get first train service
By 2024, Sikkim is predicted to join the national network and the nation would receive
"infrastructure of strategic importance" in the Himalayan state that borders China, with more than
half of the Sivok-Rangpo railway line project already built.There will be 14 tunnels and 22 bridges on the 45-kilometer, all-weather train track that is now being built from Siliguri, West Bengal, to Rangpo, Sikkim. This route crosses mountains, ravines, and the Teesta River. Though work is being done with great caution because the entire project is located in seismic zones four and five, it is being done on a war footing.
Additionally, landslides and flash floods are a constant concern, according to Project Director Mohinder Singh of ICON International, a government PSU under the Ministry of Railways. The representative of the Indian Railway Construction (IRCON) International Limited assured that safety procedures are in place and being followed.
He added that there are future plans to include Gangtok in the itinerary.

Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
PALFINGER Reinforces India Focus at EXCON 2025
PALFINGER strengthened its long-term commitment to India at EXCON 2025, marking its largest participation at the exhibition with a 1,000 sq m boo...
