Schedule a Call Back
Tricity metro project gets green signal from Ministry
2023-06-28

The Union ministry of housing and urban affairs has given the green signal for the Tricity metro project, a month after it received the comprehensive mobility plan (CMP). The Metro proposal, as readied by the Rail India Technical and Economic Services (RITES), will tackle Tricity’s burgeoning traffic chaos. RITES has proposed a 39-km metro network, spread across Chandigarh, Mohali and Panchkula while steering clear of the heritage sectors – Sector 1 to 30.
A senior UT official said, “We have got a nod from the ministry, stating that they do not have any objection to the project. The ministry had asked the Rail India Technical and Economic Services (RITES) to prepare a detailed project report (DPR) phase-wise, which will be again sent to the ministry for funds.”
Expected to cost Rs 10,570 crore, the mass rapid transport system (MRTS) will also comprise bus terminals, bus depots and geometrical improvements at busy intersections, among others.
In April this year, Chandigarh, Haryana and Punjab accorded in-principle approval to the comprehensive mobility plan (CMP) for the tricity, prepared by RITES. The final metro network comprises two phases, spread across Chandigarh, Mohali, Panchkula and also Zirakpur, New Chandigarh and Pinjore.
In the first phase, which will be developed between 2027 and 2037, the MRTS will run from Sarangpur to Panchkula ISBT; Rock Garden to Zirakpur ISBT via Mohali Industrial Area and airport; and from Grain Market Chowk, Sector 39, to Transport Nagar, Sector 26.
The second phase, to be developed after 2037, will cover four routes: Panchkula ISBT to Panchkula Extension; Paraul, New Chandigarh to Sarangpur; Airport Chowk to Manakpur Kallar; and Zirakpur ISBT to Pinjore ISBT.
In line with RITES proposal for a robust local bus network, to encourage more people to switch to public transport and ensure smooth flow of traffic, UT has also finalised seven straight bus corridors criss-crossing through the tricity.
RITES had found that these seven corridors — Sector 43 ISBT to New Chandigarh; Sector 17 ISBT to Mansa Devi Complex; Sector 43 ISBT to Panchkula ISBT; Sector 17 ISBT to Kharar ISBT; PGIMER/Dadumajra to Zirakpur ISBT; PGIMER to ISBT Panchkula; ISBT Kharar to ISBT Zirakpur — have the maximum traffic flow.


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Hindustan Zinc Boosts Production and Safety with Emerging-Tech
Ahead of National Technology Day, Hindustan Zinc Limited, India’s only and the world's largest integrated zinc producer, reaffirmed its leaders...
Sources Unlimited Introduces Duo Boscolo’s Wireless Lamp
Sources Unlimited, India’s premier destination for luxury furniture and lighting, introduces the Duo Boscolo wireless Lamp crafted by acclaimed...
Viva launches 3D louvres for next-gen façade design
Viva, Asia’s largest manufacturer of aluminium composite panels (ACP), has introduced its advanced 3D louvres, offering a blend of architectural ...