Schedule a Call Back
Over 25 Madurai metro stations planned in DPR
At a multi-department meeting conducted on Wednesday at the district collectorate, CMRL MD M A Siddique stated that a total of 27 metro stations are planned for the 32 km rail track between Thirumangalam and Othakadai in the final detailed project report (DPR) for the Madurai metro.There had previously been plans for 18 stations spread out over 30 miles.
The 32 km length will have 27 km of elevated corridor and 5 km of underground track, according to the CMRL MD.
Three of the 27 planned metro stations will be subterranean, all of which are located in the city's centre area, according to the MD. "On the elevated route, there is typically one station planned for every kilometre. A station will be built along the underground line every 1.5 km, the MD continued.

Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
John Deere Unveils 5130M Tractor at Power & Technology Show
John Deere recently unveiled its new 5M series tractor, the 5130M (130 HP), during the company’s Power & Technology Show 7.0 in India. The ...
Blum India launches Blum Club app for carpenters and contractors
Blum India has introduced the Blum Club app, a dedicated loyalty platform designed for carpenters and contractors who install the company’s har...
India among fastest-growing real estate investment markets in APAC
Colliers has reported that India recorded one of the strongest growth rates in real estate investment across the Asia Pacific region in 2025, wit...
