Bengaluru's Double-Decker Rail Alignment Boosts Connectivity

Bengaluru's Suburban rail project introduces a unique double-decker rail alignment for Corridor one and four at Yelahanka, showcasing an innovative approach to connectivity challenges. This method eliminates level crossings by elevating the rail formation, departing from traditional roads under bridges. The new alignment tackles waterlogging issues and reduces land acquisition needs.


The approach integrates effectively with the Bengaluru Metro at Benniganahalli, leading to cost savings and minimal demolitions. Minister MB Patil reveals that Corridor two, from Chikkabanavara to Baiyappanahalli, aims for completion within 26 months. The project is currently 10-15% complete, with groundwork involving land acquisition from South Western Railways and private and government properties.


Around 12 stations are planned under Corridor two, with 10 train rakes targeted for completion by 2025. Minister Patil also outlines plans for Corridor three and the Whitefield-Kengeri stretch under Corridor four. An ambitious proposal extends the suburban network to various locations, potentially expanding its reach to 452 km.


The project is budgeted at $157.67 bn, with $10 bn allocated for the current fiscal year and plans to secure $74.38 bn from the KFW European Bank. Corridor two's groundwork, surveying, utility identification, and geotechnical investigation are complete, with the project advancing to ground levelling and facility establishment. An eight-kilometre priority stretch from Chikkabanavara to Yeshwanthpur symbolises the project's momentum in reshaping Bengaluru's rail connectivity landscape.


Related Stories

NTPC Green Energy Capacity Touches 8,688 MW After Khavda-II CoD

NTPC Green Energy (NGEL) has announced the commercial operation of the first part capacity of 210 MW from its 1,200 MW Khavda-II Solar PV Project...

Read More

EPI Floats EoI for 250 MW Solar EPC Project Near Bikaner

Engineering Projects (India) (EPI) has invited an Expression of Interest (EoI) to associate with a suitable backend partner or contractor for the...

Read More

Naidu Pushes Rs 1.40 Trillion National Highway Works in Andhra Pradesh

Andhra Pradesh Chief Minister N Chandrababu Naidu has directed officials to expedite the completion of ongoing National Highway projects in the sta...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back