Maharashtra Proposes RPO Compliance Regulation Changes

The Maharashtra Electricity Regulatory Commission (MERC) has put forth amendments to the Renewable Purchase Obligation (RPO) and its Compliance and Implementation of Renewable Energy Certificate Framework Regulations of 2019. The proposed changes encompass Wind RPO, Hydro Purchase Obligation (HPO), Energy Storage Obligation (ESO), and other RPO compliance rules. The operating period for the suggested RPO framework will begin on April 1, 2020, and conclude on March 31, 2030. Key provisions include the ability to meet Wind RPO through energy from new wind projects post-March 31, 2022, and surplus energy from earlier projects. The HPO must be met through energy from hydro projects commissioned between March 8, 2019, and March 31, 2030. The ESO will be quantified in energy units, with a minimum of 85% of the annual energy stored in the Energy Storage System originating from renewable sources. Incentives and penalties have been outlined for DISCOMs based on their achievement of RPO targets.

Related Stories

Fischer UltiMate™ Series Adds USB-C with Ratchet Locking System

Fischer Connectors, the global leader in high-performance connectivity solutions, has brought its world-renowned Swiss engineering expertise to t...

Read More

Tembo Global bags DI pipe orders worth Rs 51.82 crore

Tembo Global Industries has secured two major domestic orders totalling Rs 51.82 crore for the supply of ductile iron (DI) pipes, reinforcing its...

Read More

IDS brings Spain’s Brétema lighting collection to India

IDS by Innovative Design Group has launched the Brétema collection by Spanish brand a·emotional light in India. The handcrafted lighting range,...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back