GUVNL invites bids for battery energy storage systems

Gujarat Urja Vikas Nigam (GUVNL) has invited bids to set up pilot projects of 250 MW/500 MWh standalone battery energy storage systems (BESS) in Gujarat under tariff-based global competitive bidding (Phase-II).

The last day to submit the bids is January 6, 2023. Bids will be opened on January 10. Bidders must submit a bid processing fee of Rs 1.5 million ($17,993) and an earnest money deposit of Rs 740,000 ($8876)/ MW.

Selected bidders must furnish Rs 50,000 ($6,000)/ MW as a performance bank guarantee before signing the battery energy storage purchase agreement (BESPA).

The projects will be developed under a build, own, and operate model. GUVNL seeks to utilize energy storage systems on an on-demand basis, suited to the requirements of the state distribution companies during peak and off-peak hours.

The project must be completed within 18 months from the effective date of BESPA. The minimum bid size must be 140 MWh (70 MW x 2 hours)

Related Stories

Concord Control Systems bags ₹56.58 crore Indian Railways order for locomotive safety systems

Concord Control Systems has secured a ₹56.58 crore order from Indian Railways for the supply, installation and commissioning of locomotive wire...

Read More

Hafele expands Bengaluru footprint with new Appliances Studio in Bommasandra

Häfele India has expanded its retail footprint in Bengaluru with the launch of Appliances Studio Amro Interio, its third exclusive appliances stud...

Read More

Godrej expands Kerala footprint with exclusive home locker store in Kochi

Godrej Enterprises Group has expanded its footprint in Kerala with the launch of a new exclusive store in Kochi, strengthening its presence in one ...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back