Schedule a Call Back
Flyover construction at Thoraipakkam on OMR begins

Tamil Nadu Road Development Company (TNRDC) is overseeing the development of this project which includes the construction of four flyovers in an integrated manner with respective elevated lines. The estimated cost of this project is INR 459.32 Crore, with INR 331 Crore sanctioned by TNRDC and the remaining amount to be sanctioned by CMRL.
OMR is a part of Corridor 3 of the 116km-long Chennai Metro Rail?s Phase II, which connects Madhavaram and SIPCOT through Ayanavaram, Perambur, Thousand Lights, Royapettah, Thirumayilai, Adyar, Indira Nagar, Tiruvanmiyur, Taramani, Perungudi and Thoraipakkam. It is planned as an underground stretch from Madhavaram to Taramani and continues as an elevated corridor till SIPCOT.
The flyover will be developed at the first level, elevated at a height of 6m from the ground, whereas the Chennai Metro Rail Line will be at the second level, elevated at 18m from the ground. The authorities also announced that contracts for the work would be awarded shortly.


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
MMRDA Clears Rs 120 Bn Metro and Transport Projects
The Mumbai Metropolitan Region Development Authority (MMRDA) has approved 19 major infrastructure projects worth over Rs 120 billion at its Execu...
Singh Gives CDS Power To Issue Unified Orders For Three Services
In a stride towards modernising defence governance, Raksha Mantri Shri Rajnath Singh has empowered the Chief of Defence Staff and Secretary, Depart...
Bengaluru Clears Rs 420 Bn Silk Board–Hebbal Tunnel Plan
The 16.68-kilometre tunnel road planned between Central Silk Board and Hebbal, near Esteem Mall, will run some 36 metres (120 feet) below ground. B...