Schedule a Call Back
PM Modi inaugurates 3 SECL projects in Chhattisgarh

In one of the projects, the Dipka Open Cast Project (OCP) coal handling plant has been constructed at a cost exceeding Rs 2.11 billion. The project boasts an annual coal handling capacity of 25 Million Tonnes (MT), an overground bunker with a capacity of 20,000 tonnes, and a 2.1-kilometer-long conveyor belt. The loading system is expected to facilitate the rapid loading of 4,500-8,500 tonne of coal per hour, as per the statement.
The second project, the Chhal OCP coal handling plant, which was built at a cost of more than Rs 1.73 billion has a capacity to handle 6 MT of coal annually. It includes an overground bunker, a 1.7 km conveyor belt, and a silo with a capacity of 3,000 tonnes.
Additionally, the Prime Minister will inaugurate the Baroud OCP coal handling plant, designed to handle 10 MT of coal annually, at a cost of Rs 2.16 billion. The project is equipped with an overground bunker with a capacity of 20,000 tonnes and a 1.7 km conveyor belt. It features a rapid loading system capable of loading 5,000-7,500 tonnes of coal per hour.
The First Mile Connectivity (FMC) projects collectively have a value of Rs 6 billion. SECL, being a subsidiary of Coal India, operates under the Ministry of Coal.


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
India Launches First Maritime Sector NBFC
Union Minister Sarbananda Sonowal recently inaugurated Sagarmala Finance Corporation Limited (SMFCL), India’s first NBFC dedicated to the marit...
We’re committed to setting benchmarks in sustainable luxury living
From a landmark land acquisition in Boisar to ambitious launches across the Mumbai Metropolitan Region (MMR), National Capital Region (NCR), Beng...
SECI Extends Green Ammonia Bid Deadline to 30 June
The Solar Energy Corporation of India (SECI) has extended the bid deadline for its green ammonia tender to 30 June 2025. The tender was issued un...