We implemented the latest SAP Cloud solution within 9 month

Patel Engineering’s Sela Tunnel project in Arunachal Pradesh, one of the longest bi-lane tunnel projects situated above 13,000 ft feet with temperatures dropping as low as -15°C, was recently inaugurated. R SRINIVASAN spoke to Kavita Shirvaikar, CFO and Whole-Time Director, Patel Engineering, to learn more about the company’s operations and adoption of technology. Excerpts:

Does the company have projects in Tier 2 and 3 cities and what is the difference between these projects and the ones in Mumbai?
The company's projects span 16 states in India, with a majority situated in remote areas in the North (Jammu and Kashmir; Himachal Pradesh) and Northeast India (Assam and Arunachal Pradesh). Additionally, we have several projects located in Mumbai. 

Related Stories

PVV Infra Targets 13 NHAI Way Side Amenities Projects

PVV Infra has outlined an accelerated growth strategy focused on National Highways Authority of India (NHAI) Way Side Amenities (WSA), positionin...

Read More

Hindalco Posts Record Revenue and EBITDA

Hindalco Industries, the Aditya Birla Group’s metals flagship, reported its highest-ever consolidated revenue and EBITDA for the quarter and year...

Read More

Panattoni India Announces Rs 1.5 Billion Hyderabad Hub

Panattoni, a global industrial real estate developer, has announced its entry into Hyderabad with a Rs 1.5 billion advanced manufacturing project...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back