Srinagar's Mughal Road expected to open in April

The Mughal Road, closed for more than four months because of heavy snowfall, is expected to reopen for one-way traffic the following month, allowing passage from Shopian to Poonch.

Efforts were underway to clear the historic road, with expectations that it would be open by the end of the month. Abdul Rahman, a mechanical engineer for Anantnag division, stated that snow clearance operations were progressing well, anticipating clearing till Peer Ki Gali by the following day. He added that the reopening date would be determined by the District Administration Shopian, with a single track expected to be operational soon.

After heavy snowfall on December 16, the Mughal Road had been shut down due to snow accumulation at various points along the highway.

This 90-kilometer stretch from Bufliyaz in Poonch to Heerpora in Shopian serves as an alternative to the Srinagar-Jammu National Highway and routinely closes in winter due to snow buildup.

Related Stories

Concord Control Systems bags ₹56.58 crore Indian Railways order for locomotive safety systems

Concord Control Systems has secured a ₹56.58 crore order from Indian Railways for the supply, installation and commissioning of locomotive wire...

Read More

Hafele expands Bengaluru footprint with new Appliances Studio in Bommasandra

Häfele India has expanded its retail footprint in Bengaluru with the launch of Appliances Studio Amro Interio, its third exclusive appliances stud...

Read More

Our device can do 60-70 per cent of inspections remotely

Jarsh Safety, the Hyderabad-based industrial deep-tech startup, is redefining frontline worker protection with advanced safety wearables. In conver...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back