Bridge to the Future

A 40-year-old entity with roots in Delhi and a sprawling factory in Meerut, JCL Infra successfully launched a bowstring girder weighing around 540 Metric Tonne at the Manoharabad-Gajwel section of the Hyderabad Division of the South Central Railway, in Telangana. The launch of the girder, a vital component of bridge construction, was carried out with utmost precision and quality. The project took around seven months to execute. A stalwart in the infrastructure and steel fabrication industry, the company has carved a niche in executing infrastructure projects with specialisation in railway track assemblies and sleeper coaches, among others.

“The cost of the project is around Rs 110 million,” shares Sandeep Gupta, Head-Operations, JCL  Infra. “JCL Infra used the innovative and state-of-the art ‘end pulling and slide slewing method’ for this project.

To read the full story, CLICK HERE

Related Stories

Dilip Buildcon Bags Rs 2.09/kWh 100 MW Solar Project in MP

Dilip Buildcon, through its joint venture DBL-APMPL, has secured a 100 MW captive solar power project in Madhya Pradesh, winning the contract at ...

Read More

PM Surya Ghar: PSBs Approve Rs 109 billion for Rooftop Solar Loans

In a major boost to India’s renewable energy transition, Public Sector Banks (PSBs) have sanctioned loans worth Rs 109 billion under the PM Sur...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back