Schedule a Call Back
Safety concerns arise over Mumbai's newly opened Coastal Road tunnel leaks

Leaks have been sighted on both sides of the walls in the southbound tunnel, with the slab above also appearing wet. The ongoing water leakage has resulted in the paint on the walls peeling off. The BMC is under scrutiny as it prepares to open another tunnel soon. The adjacent northbound tunnel, which is still under construction, is anticipated to open in June. The persistent leaks, initially identified during testing and supposedly fixed, have reappeared within two months of the tunnel's opening.
A senior official involved in the Coastal Road project mentioned, We are dealing with expansion joints located every 20-30 meters, not cracks. These joints allow for contraction and expansion, causing the leakage. We will immediately address the leaks by employing injection waterproofing and grouting to seal them. This issue typically arises during construction or due to equipment usage, but once resolved, further leakage should not occur. The water has dispersed, leading to the loss of colour.
The Coastal Road tunnel is notable for being India's first constructed using tunnel boring technology. The entire coastal road from Mumbai to Kandivali spans 29 km, with the completed phase in South Mumbai covering 10.58 km. The project has incurred an approximate cost of Rs 127.21 billion.


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
CommScope Launches CableGuide 360 and Enhanced FiberREACH Solutions
CommScope, a global leader in network connectivity, has introduced two new solutions under its SYSTIMAX® 2.0 portfolio—the enhanced FiberREACHâ„...
Centre, Karnataka To Support Mango Farmers Amid Price Drop
In a significant move to support mango farmers in Karnataka facing falling prices, the Union Minister for Agriculture, Farmers’ Welfare and Rur...
Lodha Buys Rs 5.67 Billion Transit Units in Mankhurd
Mumbai-based listed real estate developer Lodha Developers Limited has acquired 945 permanent transit camp (PTC) units measuring 339,000 square fee...