RDSO finalise oscillation trials on Indore Metro

Indore Metro Phase 1 advances with the completion of oscillation and brake performance trials on the Yellow Line through three coaches manufactured by Alstom conducted by Research Design and Standards Organisation (RDSO). The oscillation trials were conducted with an aim to evaluate the stability and performance of the three different coaches during the movement, ensuring that the commencement of operation on Indore metro meets the safety and performance standard. The Emergency Braking Distance (EBD) was also reviewed by the RDSO team to evaluate the efficient stopping of trains during the operations. Indore Metro is an under construction Mass Rapid Transit System ( MRTS). `The state government approved the Detailed Project Report (DPR) of Phase 1 in December 2016 while the central government cabinet approved the DPR in October 2018. Phase 1 of Indore metro consists of one corridor ( Yellow Line ) spanning 33.53 km with 29 stations in total.

Related Stories

MMRDA Clears Rs 120 Bn Metro and Transport Projects

The Mumbai Metropolitan Region Development Authority (MMRDA) has approved 19 major infrastructure projects worth over Rs 120 billion at its Execu...

Read More

Singh Gives CDS Power To Issue Unified Orders For Three Services

In a stride towards modernising defence governance, Raksha Mantri Shri Rajnath Singh has empowered the Chief of Defence Staff and Secretary, Depart...

Read More

Bengaluru Clears Rs 420 Bn Silk Board–Hebbal Tunnel Plan

The 16.68-kilometre tunnel road planned between Central Silk Board and Hebbal, near Esteem Mall, will run some 36 metres (120 feet) below ground. B...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back