Schedule a Call Back
Bhilai Steel Plant to Build 200-KW Solar Power Plant at Maitri Bagh Zoo

Elevated solar panels, mounted above the ground, will allow space beneath the structure to be used for outdoor seating or storage, with the added benefit of growing fodder for animals. The energy generated will supply power to both the zoo and the adjacent Jawahar Udyan.
The elevated plant, designed to be one of the tallest solar installations in the region, will produce 24,000 units of electricity each month, totaling 288,000 units annually. The installation uses high-efficiency monocrystalline bifacial solar modules, which maximize energy production while occupying less space.
The plant’s structure is substantial, standing at a height of 3.5 meters in the front and increasing to 5.5 meters at the back, weighing approximately 30 tons to ensure stability.


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
India Launches First Maritime Sector NBFC
Union Minister Sarbananda Sonowal recently inaugurated Sagarmala Finance Corporation Limited (SMFCL), India’s first NBFC dedicated to the marit...
L&T Tech Services Wins $50 Mn+ Deal from Global Energy Major
L&T Technology Services, a global leader in engineering and technology services, announced that its Sustainability segment has been selected ...
SECI Extends Green Ammonia Bid Deadline to 30 June
The Solar Energy Corporation of India (SECI) has extended the bid deadline for its green ammonia tender to 30 June 2025. The tender was issued un...