Schedule a Call Back
Noapara-Airport Metro in Kolkata Completes First Trial Run Successfully

The Metro Railway Kolkata General Manager, P. Uday Kumar Reddy, was present during the trial. On its way to Jai Hind Biman Bandar Metro station, the train stopped at Dum Dum Cantonment station for inspection. The trial rake reached Jai Hind Biman Bandar Metro station at 12:31 pm.
During the return journey, the train departed from Jai Hind Biman Bandar Metro station at 1:57 pm and arrived at Noapara Metro station at 2:21 pm.
The route includes four stations: Noapara, Dum Dum Cantonment, Jessore Road, and Jai Hind Biman Bandar. Spanning 7.03 km, the route comprises 1.8 km of underground track and 5.23 km on a viaduct. News source: ET Infra


Subscribe Now
Subscribe to our Newsletter & Stay updated
RECENT POSTS
Popular Tags
Folliow us
Related Stories
Hindustan Zinc Launches Inclusive Language Guide to Promote Workplace Diversity
Udaipur, 3rd July 2025: Hindustan Zinc Limited (NSE: HINDZINC), the world’s largest integrated zinc producer, has made a significant stride tow...
India Warehousing Show Concludes with Record Participation
The 14th edition of the India Warehousing Show (IWS) 2025 wrapped up successfully at Yashobhoomi (IICC), Dwarka, drawing over 300 exhibitors from...
BharatBenz Launches New Mining Range to Support India’s Infra Growth
Chennai, India: The Indian construction and mining equipment sector is set to grow significantly, projected to increase from $16 billion to $45 b...