Trial Runs Begin for Metro Rail Extension to Sachivalaya

Trial runs for the extension of the Ahmedabad-Gandhinagar Metro to Sachivalaya began recently, announced Gujarat Metro Rail Corporation (GMRC). This Phase 2 expansion will offer passengers direct metro connectivity from Ahmedabad to the Sachivalaya (Secretariat) in Gandhinagar.

Phase 2 connects Ahmedabad to Gandhinagar through two corridors: the Motera Stadium-Mahatma Mandir corridor and the GNLU-GIFT City corridor. The Motera-Mahatma Mandir route, also called the Yellow Line, features 21 stations, seven of which are already operational, from Motera Stadium to Sector 1 station in Gandhinagar.

Previously, passengers traveling to Sachivalaya had to transfer at Sector 1 station to another mode of transport. With trial runs underway, this issue will soon be resolved. Upon completion of the trial runs, seven additional stations on the Yellow Line are expected to become operational within the next three months.

Related Stories

QNu Labs Validates ARMOS QKD in Global VIAVI Study

QNu Labs (www.qnulabs.com

), a global leader in end-to-end hybrid quantum cybersecurity solutions, has announced the findings of a rese...

Read More

Panasonic hosts Co.lab Studio IGNITION roadshow in Bengaluru

Panasonic Life Solutions India hosted the ‘Co.lab Studio by IGNITION Roadshow’ in Bengaluru, bringing together startups, ecosystem partners and...

Read More

Bondada Commissions 48.2 MWp Solar Projects

Bondada Engineering has commissioned 48.2 MWp of solar power projects in March 2026 for clients including Paradigm IT and MAHAGENCO across multip...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back