Trial Runs Begin on Metro Line 2B’s Mandale-Mankhurd Stretch

The Mumbai Metropolitan Region Development Authority (MMRDA) has initiated trial runs on a key stretch of Metro Line 2B (Yellow Line), connecting Mandale to Mankhurd. The 5.3 km segment, part of the larger 23.6 km corridor from DN Nagar to Mandale, covers five stations: Diamond Garden, Shivaji Chowk, BSNL, Mankhurd, and Mandale.

The trial aims to evaluate the interaction between rolling stock and civil infrastructure, including the tracks, signalling systems, and communications-based train control (CBTC).

Tech-Heavy Tests Underway In addition to civil checks, MMRDA is testing telecommunication systems, automatic fare collection mechanisms, and platform screen doors. Commercial operations will commence only after the Commissioner of Metro Rail Safety (CMRS) gives the green light.

Mandale Depot Nears Completion Supporting operations on this line will be the 72-rake capacity Mandale Depot—India’s largest metro depot—which is now 98% complete.

Industry Heads-Up: For those interested in metro innovations, the 5th edition of InnoMetro, India’s top rail transit expo, is scheduled for May 21–22, 2025, at Bharat Mandapam, Hall No. 4, New Delhi, featuring the latest in rail safety, infrastructure, and AI.

Related Stories

Expleo FY25 PAT Up 15 Per cent, Income Crosses Rs 10 Billion

Expleo Solutions Limited announced its financial results for the year ended 31st March 2025, reporting total income of Rs 10.41 billion, a rise o...

Read More

SAIL Signs Digital Twin Pact with ABB India for Rourkela Plant

ABB India and Steel Authority of India Limited (SAIL) have signed a memorandum of understanding to deploy digital twin technology at the Rourkela...

Read More

Nearly Entire Delhi-Meerut RRTS Corridor to Open by June, 10 Mn Served

By the end of June, travel time from Sarai Kale Khan in Delhi to Modipuram in Uttar Pradesh’s Meerut is expected to be just 45 minutes, as the ...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back