Steel Ministry Plans Mining Vertical at SAIL

The Ministry of Steel is considering the creation of a dedicated mining vertical within Steel Authority of India Ltd (SAIL) to enhance iron ore production, a senior government official has confirmed.

The proposal, currently under discussion at the ministerial level, aims to streamline and strengthen SAIL’s mining operations in support of its long-term expansion strategy. SAIL, one of India’s largest integrated steel producers, holds several captive iron ore blocks across the country.

“The Ministry is in talks with the company. The structure of the proposed vertical is being worked out and will be shared with SAIL for further action,” the official stated.

The planned mining unit would focus on increasing iron ore output to align with SAIL’s ambition to raise its installed steel-making capacity to 35 million tonnes per annum (MTPA) by 2030. Iron ore is a crucial raw material in the blast furnace-based steel manufacturing process.

SAIL, which operates under the administrative control of the Ministry of Steel, is the country’s third-largest iron ore producer. It manages a network of 15 iron ore mines in Jharkhand, Odisha, and Chhattisgarh, along with four coal mines and three flux mines.

In FY 2024–25, the company produced 33.78 million tonnes of iron ore, 0.59 million tonnes of coking coal, 0.84 million tonnes of thermal coal, 1.31 million tonnes of limestone, and 0.40 million tonnes of dolomite.

A query sent to SAIL regarding the development remained unanswered at the time of publication.

Related Stories

QNu Labs Validates ARMOS QKD in Global VIAVI Study

QNu Labs (www.qnulabs.com

), a global leader in end-to-end hybrid quantum cybersecurity solutions, has announced the findings of a rese...

Read More

Panasonic hosts Co.lab Studio IGNITION roadshow in Bengaluru

Panasonic Life Solutions India hosted the ‘Co.lab Studio by IGNITION Roadshow’ in Bengaluru, bringing together startups, ecosystem partners and...

Read More

Bondada Commissions 48.2 MWp Solar Projects

Bondada Engineering has commissioned 48.2 MWp of solar power projects in March 2026 for clients including Paradigm IT and MAHAGENCO across multip...

Read More

Reach out to us

Call Abin Antony
+91 8424 045 185 /
91-22-31033000

Schedule a Call Back