MMRDA Clears Rs 120 Bn Metro and Transport Projects

The Mumbai Metropolitan Region Development Authority (MMRDA) has approved 19 major infrastructure projects worth over Rs 120 billion at its Executive Committee meeting held recently. These initiatives are aimed at strengthening metro connectivity, enhancing multimodal transport systems, and accelerating urban mobility across the Mumbai Metropolitan Region (MMR).

Chief Minister Devendra Fadnavis hailed the move as a strategic step towards a smarter, more connected Maharashtra. “These projects will accelerate economic activity and significantly enhance the quality of life. This is more than just investment in metros—it’s about transforming the state's urban future,” he said.

Among the major contracts, Larsen & Toubro Ltd. secured a Rs 47.88 billion deal for integrated systems—rolling stock, signalling, and depot equipment—on Metro Lines 4 and 4A, along with five years of maintenance. The revised civil works cost for Metro Line 4A was set at Rs 5.58 billion, and L&T will also execute Rs 1.89 billion worth of ballastless track work on Line 4.

On Metro Line 6, IRCON International Ltd. was awarded a Rs 6.68 billion contract for power supply and E&M systems, while NCC Ltd. secured a Rs 22.7 billion contract for rolling stock and signalling. For multi-modal integration on Metro Lines 4 and 4A, the authority approved Rs 5.35 billion across four joint ventures.

Additional contracts include:
  • Rs 2.5 billion to Aurionpro Solutions Ltd. for automatic fare collection (AFC) systems on Lines 4 and 4A
  • Rs 1.18 billion to the Leena Powertech–Umesh Brothers Consortium for overhead electrification on Lines 9 and 7A
  • Rs 1 billion to Paras Railtech Pvt. Ltd. for ballastless track work on Metro Line 2B
  • The Mumbai Trans Harbour Link (MTHL)’s Package-4 contract for intelligent transport systems and toll management was revised to Rs 5.51 billion.

Deputy Chief Minister and MMRDA Chairman Eknath Shinde highlighted the focus on seamless and sustainable mobility. “These strategic investments will shape the future of inclusive transport in Maharashtra,” he said.

MMRDA Metropolitan Commissioner Sanjay Mukherjee added that the authority remains committed to improving last-mile connectivity and speeding up project timelines, with a focus on delivering commuter-friendly infrastructure that enables integrated, multimodal travel across the region.

Related Stories

Delhi–Jaipur Drive to Shrink by One Hour

The National Highways Authority of India (NHAI) will open a 67-kilometre four-lane spur between Bandikui and Jaipur by mid-July, trimming the Del...

Read More

Singh Gives CDS Power To Issue Unified Orders For Three Services

In a stride towards modernising defence governance, Raksha Mantri Shri Rajnath Singh has empowered the Chief of Defence Staff and Secretary, Depart...

Read More

Bengaluru Clears Rs 420 Bn Silk Board–Hebbal Tunnel Plan

The 16.68-kilometre tunnel road planned between Central Silk Board and Hebbal, near Esteem Mall, will run some 36 metres (120 feet) below ground. B...

Read More

Reach out to us

Call us at +91 8108603000 or

Schedule a Call Back